GST

If goods of single invoice moved in multiple vehicles simultaneously , then how to issue e-way bill ?

The EWB will be generated for all vehicles if the goods are transported in a semi-knocked down or fully knocked. 

(a) The supplier shall issue the full invoice prior to dispatching the first consignment.

(b) The supplier shall issue a delivery certificate for each subsequent consignment, referencing the invoice.

(c) Each consignment shall include copies of each delivery challan and a certified copy of invoice.

(d) An original copy of invoice must be sent with the last consignment. Please note that multiple EWBs may be required in this instance. The EWB must be generated for each consignment using the details of the delivery challan and the vehicle number.


How can a registered person integrate their systems with the eway bill system in order to generate the e -way bills from their own system?


What do you mean by API Interface?


What are the benefits of having API Interface


For using API Interface, what are the pre-requisites out there?


In the e-way bill system how does the taxpayer become the transporter?


How can the taxpayer update his business name, email, address or mobile number in the e-way bill system?


Why a taxpayer need sub users ?


In what numbers sub-users can be created ?


Why the reports can be generated only for a single day ?


Why EWB allow users to create masters to enter ?


Is it possible to upload the available master to e-way billing ?


What does detention report means under grievance menu ?


When detention report can be upload ?


What does over Dimensional Cargo means ?


What is the procedure for the consignor to authorize e-commerce operators, courier agencies and transporters to generate PART-A of an e-way bill ?


How to carry e-way bill in public transport ?


What does consignment value means ?


Is there need to carry e-way bill if goods transported by railways ?


Is there need an e-way bill in vehicle carrying goods from CSD to unit run canteens ?


Is there need of e-way bill in the movement of cargo containers ?